Tuesday, 26 June 2018

Melbourne Airport Rail Link - The Case for New Stations

Melbourne appears to be inching ever closer to proceeding with an Airport Rail Link, with the Federal Government promising to contribute $5bn towards the project, in spite of the ample evidence that $5bn would be far better spent on the Melbourne rail network by extending it to Rowville, Monash or even finally electrifying the Melton line.

Major credit to the State Government for their response to Turnbull's pure populism play. I've long had a sense that Daniel Andrews knows full well how poorly airport rail stands up to a proper cost-benefit analysis relative to almost any other possible similarly scaled improvement to Melbourne's rail network.

The state government has been insistent that if this project proceeds, it needs to be about more than just getting businesspeople to their flight on time on the dozen or so times a year the majority of them will ever travel.

Sunshine Station in Melbourne's west has enormous potential to develop as a new transport
and employment hub for the entire western region.


Unlocking The True Potential of Melbourne's Airport Rail Link

We've discussed this as nauseum here in the wombat burrow and so I won't bore you further tonight, particularly as the debating horse appears to have bolted somewhat. Some form of airport rail link is going to happen, and so as we've equally insisted before, we are about making sure if it goes ahead that it delivers the maximum benefit to the Melburnians who matter most - those who presently have tenuous access to viable public transport options. Doing it for Zone Two, as we like to say.

The state government is correct to situate the real scope of this project's potential in the context of "unlocking the City's west", and of seeking to ensure, as Melbourne's growth rebalances west now that little opportunities to expand east remain, that we don't repeat the mistakes our planners made over the part 50 years in creating vast greenfields development zones situated in public transport black holes, thereby locking their residents perpetually into inequitable, antisocial and unhealthy transport options largely confined to car dependency.

The Regional Rail Link project remains little understood and unheralded by most Melburnians, but I maintain it is the single most important infrastructure project that a Victorian government has undertaken in my lifetime. It is unquestionably John Brumby's greatest legacy. In years to come Melbourne will realise that this project has nothing to do with V/Line, because it's eventually going to be incorporated into the metro rail system, and it creates the opportunity to plan vast new greenfields residential sites around heavy rail.

As one also suspects that sticking to the original, more ambitious Metro rail project while canning the East-West Link will come to be seen as Daniel Andrews' eternal gift to Melbourne. In time I hope this decision will come to be seen as the first significant move by any Victorian politician to effect a recalibration towards mass transit investment which in turn set Melbourne up to become one of the great, if not the eminent industrial and social fulcrums of the Asia-pacific region.

The government also deserves credit for placing the project in the context of the possibilities to enable fast rail to Geelong. So we're seeing something of project's aims being lifted towards the horizon in two key dimensions - better enabling a public transport-oriented future for the West, and advancing the decentralisation agenda by rendering Geelong a viable commuter city to Melbourne.

I intend today to dwell today mostly in the former dimension as to a large extent the big questions around fast rail are all technical-boring ones regarding how to do it. My main agendas are seeing the line divert via Avalon, and at what point are we going to electrify the regional rail link anyway?

And I have two broad based pleas for the government to insist upon being part of the project if we are to have at least the benefits column of Turnbull's vanity project maximised.



1. Let's Electrify the ENTIRE Albion Rail Corridor Through to Jacana/Craigieburn

The below illustration shows the state government's approximate preferred route for airport rail as the leftmost orange track. Green is the Urban Growth Boundary, light blue is the existing tram network and dark blue heavy rail.

My proposal is to also electrify the entire remainder of the Albion freight corridor to where it reconnects with the Craigieburn line at Jacana (the right hand orange spur).


The point of this is to allow for services running Broadmeadows-Footscray (or potentially further), leaving the airport link free to run express past all but two of my new commuter stations I'm suggesting below. We've then plugged one of the largest heavy rail blackspots in Melbourne, created viable local heavy rail transit options into several existing and potential employment centres, and furthered the goal of de-radialising the network.

Furthermore the entire northwest has indirect heavy rail access to the airport. And this is as much about acknowledging that the airport is actually one of the few existing concentrated employment zones outside Melbourne's CBD as it is travellers.

Their journey would necessitate one change at the new Keilor Park station (more below) to connect with the airport rail link proper, but Melbourne folk are only unused to interchange travel because of the existing radial nature of the network.

The point of this full electrification is really about giving people in the northwest a viable heavy rail transport option to local employment centres, while also facilitating the growth of those centres.


2. Let's Build FIVE New Commuter Stations

I can already hear the armchair experts slingshotting out of their recliners. "Don't be a fool, you know every new station adds a huge amount of time to the journey, and we need to be competitive with road."

Well, bulldust. The main benefit of airport rail to commuters is RELIABILITY. So long as we can tell people exactly what time they will be at the Tullamarine terminus, they will plan their journey accordingly. They will not do a mental calculation on exactly how long a hypothetical road journey might take.

Regardless, as per above, we will only catering to two of the new stations on the actual airport rail link.

So, my proposed airport rail would have stops at the CBD obviously and travel via the Metro Tunnel to stop Footscray, Sunshine then three new stations - Keilor Park, Airport West and Tullamarine Airport, which would provide for a reliable service that is time-competitive with road and which delivers maximal integration with the existing commuter network.

The picture is completed with new stations at Sunshine North, Keilor East and Gowanbrae, all servicing either existing employment centres or greenfields residential, approximately in the locations set out below.


Future Proofing the West

You will also note the above diagrams include the sometimes mooted extension of the 59 tram line to the airport. It's really an afterthought, but I was interested in seeing what the airport's potential public transport catchment looked like with that added. I think it's fair to say this would not be used by travellers, this is purely to create a maximally public transport enabled employment centre whose effective catchment would now reach all the way down to Essendon.

I intend to spend more time breaking down some of the more recent journey to work data to gain some idea what percentage of Tullamarine airport and related facility employees, live within this catchment, and ideally that data would inform the decision of whether the tram connection was worthwhile.

And to ice this cake properly, if we scale back a little and look at a similar treatment for the inevitable Upfield Line extension (which already exists as unelectrified single track, shown in red below), and further back still to incorporate the Regional Rail Link (royal blue), with its potential for well planned and managed greenfields public transport oriented development, then the risen creation looks something like the image below.


Now, that starts to look more like my definition of a NETWORK - a decentralised lattice of interconnected nodes. And if we accept the other great wombat thesis that a radically decentralised rail network is necessary to secure Melbourne's future, the city's west suddenly looks full of potential for building great, sustainable communities with easy rail access to decentralised job centres.

Transforming Melbourne at Scale


And if we were to scale back even further, and if readers will allow me to bleat once more  about the transformative potential for Melbourne of one or more outer suburban orbital tunnel/s (see HERE for the detail of THAT complete scheme), then ultimately I would suggest this entire project be considered but stage one in a much grander scheme linking all the major current and potential northern suburbs employment locations with heavy rail that operates radially IN to them as destinations in their own right.


Now, that to me looks properly transformative. And we are at the point where we need change on that scale for the sake of Melbourne's future. The current process of incrementalism is really just locking in the car culture by fiddling with small capacity improvements for rail while roads soak up the majority of the available resources. But one of those resources - space - is very finite, and we are surely approaching the point where we are physically unable to cater to much more incrementalism.

Let's make Turnbull's airport rail boondoggle the beginnings of Melbourne's quantum leap into a 20 minute city that actually exists outside the usual rhetoric.

Tuesday, 5 January 2016

High-Speed Rail is a Dumb Idea for Australia - but a brilliant one for Victoria

The (Shaky) Case for HSR in Australia



The 2013 High Speed Rail in Australia Study Phase 2 Report (large pdf file) was delivered in 2012 as a preliminary study towards constructing High-Speed Inter-Capital Rail along the Australia's eastern seabord.

The study proposed a service allowing for conventional High Speed Rail express journeys from Sydney to Melbourne taking 2 hours and 44 minutes. The cost of the proposed project was
"about $114 billion (in 2012 terms), comprising $64 billion between Brisbane and Sydney and $50 billion between Sydney, Canberra and Melbourne." 
The study predicted
"By 2065, HSR could attract 40 per cent of inter- city air travel on the east coast and 60 per cent of regional air travel (primarily long regional). On the three main sectors, Sydney-Melbourne, Sydney-Brisbane and Sydney-Canberra, HSR could attract more than 50 per cent of the air travel market." 
The current flight time from Sydney to Melbourne is 1 hour and 35 minutes. So allowing for the extra transfer time required with air ravel, where one generally arrives an hour before one's flight after traveling half an hour or so on a freeway, HSR would APPEAR to be relatively time competitive to its alternative mode.

But consider this - Sydney's current airport rail link carries just 17% of traffic to the airport. The alternative mode via taxi or private vehicle is both cost and time UNCOMPETITIVE with rail transit. Travelers know they'll still need to factor in getting to their hotel or wherever once at their ultimate destination and lugging their bags via some means to the train station. Somehow rail always seems sexier as an idea than as a reality to people.

The Phase Two Report numbers seem intuitively optimistic to me. I just can't see business travelers, who make up the majority of this route shifting to train travel, where the company gets their cab fare at either end anyway seeing the imperative to travel by rail. However they are backed up by international research into mode-share for HSR versus air over similar distances and volumes.

But the Phase Two Report makes it explicit; "A key (benefit) component is the assessment of time savings for travellers across their full journey including travel time, waiting time, check-in time and access time, with adjustments for the inconvenience of having to change modes."

The gains here all accrue to the private sector, but require a huge public subsidy to facilitate them. That should be an enormous warning sign to any elected official that their project is about transferring value FROM the public purse.

And that private benefit will accrue on, again by the report's own numbers, just 18,760 Melbourne-Sydney trips a year. For a $50bn pricetag. 
Over a decade, that's a 0.26 million dollar public subsidy PER TRIP. This is just ludicrous public economics. 
Let's be clear - our biggest policy problem in Australia worthy of $50bn of public funds is NOT the higher emissions caused by people traveling from Melbourne to Sydney by air.

Nor is it the amount of time these people spend getting to or from the airport a handful of times a year on average. Air transport emissions are an issue of certain public concern obviously, but in the greater pantheon of public spending demands, it isn't remotely on the radar.

But the straining of our eastern capital cities IS. Enabling regional commuter centers and allowing us to end the process of urban sprawl that leaves the city's most needy consigned to urban ghettoes with poor social services and networks IS, at least for this commentator somewhere close to the top of our list of needs.

INTER-CAPITAL HSR

- BUILDING THE WRONG NETWORK 

And so it gets worse.

Again the Phase Two Report states "To achieve the target journey time of under three hours for Sydney-Melbourne, an average journey speed of approximately 300 kilometres per hour would need to be achieved. This would require a system capable of a maximum operating speed of 350 kilometres per hour, to allow for some slower sections of track."

But the study also clearly articulates that these speeds won't be possible if the network is also used for commuter travel into suburban centres. IE this whole things assumes the trains are EXPRESS Melbourne to Sydney which COMPLETELY DENUDES HSR OF ONE OF ITS KEY BENEFITS - FACILITATING THE GROWTH OF SATELLITE COMMUTER TOWNS.

If the speed of the network is reduced to 250km/h then the Sydney-Melbourne journey time balloons to three hours and seventeen minutes - and over four hours at 200 kph.

So, we can't have a network that does both - intercapital and commuter HSR. And because I see all the REAL PUBLIC benefits from HSR as accruing from a commuter network, I believe every sane advocate of HSR in this country needs to be clamouring for an immediate re-assessment of the project's priorities to create a COMMUTER network as first priority, one that could be expanded into an inter-capital network at a later date.

COMMUTER HSR FOR VICTORIA 

- BUILDING THE RIGHT NETWORK 

Towards that end, this week we're looking at what an effective HSR network enabling commuter travel into MELBOURNE might look like, and what benefits would accrue to the state of Victoria from such a network.

Proposed Victorian High-Speed Rail Network in Stages

OBJECTIVE
To best enable commuter HSR to maximise the number of commuter journeys possible into Melbourne from effective satellite regional centres.

COSTING
This proposal is costed on the basis of the Phase 2 Study estimate of construction costs of $56m per kilometer on its proposed Shepparton-Melbourne section. This incorporates a higher cost of getting HSR in to Melbourne, but under my model if we use the existing RRL tracks/reservation the cost per kilometre may be signifcantly lower. It should also be noted that the Phase 2 Study costed track graded to run trains capable of 350 km/h. My figures only anticipate running commuter services at the lower speeds of 250 km/h, requiring track capable of max 300 km/h. So, my actual figures should be either be CHEAPER than those shown if a lower capacity track were used, or my time savings HIGHER than those indicated if we had higher capacity track.

The total construction cost of the proposal at face value is $17.03 bn. Allowing for some featherbedding, we can comfortably state the project could be delivered for under $20 bn.

FUNDING
Instead of spending $50bn on Melbourne-Sydney HSR, Canberra should jointly fund this $20bn project with the State of Victoria. It would therefore represent a $10bn investment towards the long-run development of Melbourne-Sydney HSR. Victoria would then need to find $10bn, which could easily be done with a combination of value capture methods, debt, or even a one-off "Melbourne congestion levee" implemented probably best via a Melbourne Water surcharge on everyone in Melbourne, Ballarat and Bendigo who all stand to gain from the proposal.

ROUTES/STAGING
In line with the above objectives, our best potential established regional commuter centres - by distance to Melbourne - are Ballarat, Geelong and Bendigo. At present PTV's plans for Geelong involve a long-run electrification of the route, without any clear timeline. No upgrades are planned for the Ballarat or Bendigo routes.

I propose instead, because all these services now run on dedicated Regional Rail Link tracks through suburban Melbourne, that the Ballarat and Geelong routes be completely replaced by HSR in to Southern Cross Station.

Instead of replacing the Bendigo line, which currently runs direct from Castlemaine-Melbourne and only uses Regional Rail Link from Nth Melbourne Station to Southern Cross, it is proposed to create a new HSR Bendigo-Ballarat route replacing the existing track section Bendigo through Castlemaine and with a new dedicated HSR track running via one of two routes to Ballarat, depending on whether Daylesford is included in the network.

ISSUES
Under this proposal, I envisage V/Line services continuing with existing V/Locity rolling stock on the existing Bendigo line as far as Malmsbury - that being the northernmost station that wouldn't receive HSR, although it may only be economic to continue it as far north as Kyneton. Under this proposal, this line would to return to sharing the network with Metro trains between North Melbourne and Southern Cross, though this would be a relatively minor issue.

A bigger issue would be how to have Metro trains service the planned future Melton line electrification if the RRL tracks were ripped up for HSR. One I'll set aside because it's kind of boring, but it's one that would need to be solved for Tarneit and Wyndham Vale Stations also.

The only major question posed by route selection is whether the increase in travel time to and from Castlemaine and Bendigo that would result from including a Daylesford stop on the route would be justified. At the estimated increase in time of just nine minutes, this would seem justified based on the potential to Victoria's tourism industry of being able to take a one hour train trip to Daylesford.

As stated, both the Ballarat and Geelong lines would be replaced in their entirety using current alignments and easements, with the sole exception being the dog-leg placed in the Melbourne-Geelong route to allow for the inclusion of Avalon Airport.

Provision of heavy rail to Avalon remains a major public policy concern in Victoria, and the deviation would add a matter of around three minutes to the journey, so this is a negative-brainer.

Another issue will be the need for planning and provision of metro-style public transport infrastructure in regional centers. In fact the current Victorian government has commenced tentative planning towards this end in some centers. It would need to be coordinated and consider how metro services in Geelong in particular would interact with the HSR, where HSR tracks in Geelong would replace notionally "metro" ones in the north of the city. A large part of the featherbedding in my costing is to allow for necessary track duplication works (possible with double-decking) into urban areas.

STAGE ONE - Ballarat to Southern Cross

High-Speed rail for Victoria -
Stages One (purple) and Two (blue)

Stops
Ballan
Bacchus Marsh
Melton*
Rockbank*
*to be serviced by Metro in future

Distance
121.8km 

Projected Cost
$6.8bn 

Time Savings
Please note these times are based on existing train travel times, although for our purposes a better comparison might be with current motor vehicle transit times, these are almost impossible to extrapolate meaningfully into the future.

Because Stage Three of the project envisages Bendigo trains running express from Ballarat to Melbourne, passengers will at that point be offered an even speedier express service to Melbourne.

It is envisaged that as per present services, demand to Melton and Rockbank would not initially warrant all services stopping there. Accordingly, Ballarat-Melbourne travelers would have a choice of "two stop" or "four stop" services, and ultimately also an express service.

Ballarat - Melbourne with four stops via HSR travel time 48 minutes down from 72. Save 24 minutes.
Ballarat - Melbourne with two stops via HSR travel time 42 minutes. Save 30 minutes.
Ballarat - Melbourne HSR Express travel time 36 minutes. Save 36 minutes. Travel time HALVED.

If that sort of quantum change isn't enough to induce the kind of responses we are looking for with this policy, well I'm keen to hear of any policy that could possibly do MORE...

Please note also that these time savings are predicated on speeds of ONLY 200 km/h. The likelihood of being able to build a network attaining speeds of up to 250 km/h without much incremental expense is extremely high. So these estimates are at the PESSIMISTIC end of the spectrum. The reality SHOULD be even better.

Proposed Victorian High-Speed Rail - Urban Section

STAGE TWO - Geelong to Deer Park

Stops
Lara
Little River
Avalon Airport
Ardeer*
Deer Park*
Tarneit*
Wyndham Vale*
*to be serviced by Metro in future

Distance
61.3 km new track

Projected Cost
$4.5bn 

Time Savings
As per Stage One, not all these stations demand being serviced by every train. It is envisaged travelers from Geelong would have the option of an "Express" service to Melbourne stopping only at Avalon Airport, in addition to the slightly longer services.

Geelong - Melbourne with six stops travel time 42 minutes, down from 62. Save 20 minutes
Geelong - Melbourne with four stops travel time 36 minutes, down from 62. Save 26 minutes
Geelong - Melbourne with one stop travel time 27 minutes, down from 62. Save 35 minutes. Travel Time more than HALVED.

STAGE THREE - Bendigo to Ballarat

High Speed Rail Stage Three (red), showing alternative ex. Daylesford route (light blue)
and proposed national HSR alignment (dark blue)

Stops
Kangaroo Flat
Castlemaine
Daylesford?
Ballarat
Service would run express Ballarat-Melbourne

Distance
123.5 km  via Daylesford

Projected Cost
$6.9bn 

Time Savings
Bendigo - Melbourne via Daylesford with four stops travel time 86 minutes down from 112,
save 26 minutes.
Bendigo - Melbourne ex Daylesford with three stops travel time 77 minutes down from 112,
save 35 minutes.

 

Directing Victoria's and Melbourne's Growth

So, the proposal would then set us up with the following:

Designated Regional Commuter Centers 
Greater Ballarat, Greater Geelong, Greater Bendigo, Lara, Little River, Ballan, Bacchus Marsh and Castlemaine.
NB I wouldn't propose significant residential development for Daylesford, where preserving and enhancing Tourism and Heritage values should be the objective.

Urban Fringe Stations with Fast Rail Access
Ardeer, Deer Park, Melton, Rockbank, Tarneit, Wyndham Vale 

Looking beyond this though, while it will be these designated commuter cities that stand to benefit most economically and socially from fast rail access to Melbourne, travel times will be reduced significantly to a vast range of regional towns that would it is envisaged retain their existing V/Line service as a shuttle to the nearest major center.

So, we should actually see benefits accrue to Swan Hill and Echuca, Ararat, Maryborough, all of which would still be a relatively short hop to being on the High Speed Network, and even further flung places on the network like Colac and Warrnambool should benefit proportionately also.

Proposed Northern Victorian High-Speed Rail with V/Line Shuttles (yellow)
and proposed national HSR alignment (blue)

Proposed Southern Victorian High-Speed Rail with V/Line Shuttles (yellow)

What About Freight?

Ripping up the tracks to accomodate the HSR should be easy enough, but what about freight to places like Ballarat and all the towns they serve? I don't believe it has been attempted anywhere in the world, but there would be no reason not to run a high speed freight service along this route also as per demand, in fact there would be a lot of reasons for.

Doing so would be the prelude to one way a national HSR may someday happen. We've seen the cost-benefits don't stack up, but they MIGHT if we could incorporate inter-capital HSR freight as a means to removing a large amount of the truck traffic from our highways, resulting in lower maintenance, fewer accidents, air particulates, etc.

Not to mention we'd possess an absolute world beating eastern seabord freight network by way of national competitive advantage. Because doing this initially Sydney-Canberra ought to make sense on a similar basis to the above, and if we've gone as far as Bendigo, building the extra stretch in the middle might make sense down the track.

I dunno. To my eye, all of this seems to offer a lot more concrete than any of the nebulous and largely non-public benefits we've yet heard of associated with building a national HSR network. What do readers think?